SCHEDULE OF ELECTRICITY TARIFFS
FOR ISLAMABAD ELECTRIC SUPPLY COMPANY (IESCO)
SRO 1168 (I)/2022 | October 01, 2022 | |||||
A-1 GENERAL SUPPLY TARIFF - RESIDENTIAL | ||||||
Sr. No. | TARIFF CATEGORY / PARTICULARS | FIXED CHARGES Rs/kW/M | APPLICABLE VARIABLE CHARGES Rs./kWh | |||
a) | For Sanctioned load up to 5 kW | - | - | - | ||
Protected | ||||||
i | Up to 50 Units - Life Line | - | - | 3.95 | ||
ii | 01 - 100 Units - Life Line | - | - | 7.74 | ||
iii | 001 - 100 Units | - | - | 7.74 | ||
iv | 101 - 200 Units | - | - | 10.06 | ||
Un-Protected | ||||||
v | 1- 100 Units | - | - | 13.48 | ||
vi | 101- 200 Units | - | - | 18.95 | ||
vii | 201- 300 Units | - | - | 22.14 | ||
viii | 301- 400 Units | - | - | 25.53 | ||
ix | 401 - 500 Units | - | - | 27.74 | ||
x | 501 - 600 Units | - | - | 29.16 | ||
xi | 601 - 700 Units | - | - | 30.30 | ||
xii | Above 700 Units | - | - | 35.22 | ||
b) | For Sanctioned load 5 kW & above | - | - | - | ||
Peak | Off-Peak | |||||
Time Of Use | - | 34.39 | 28.07 | |||
As per the Authority's decision only protected residential consumers will be given the benifits of one previous slab. | ||||||
As per Authority decision, residestial Life Line consumer will not be given any slab benefit. | ||||||
Under tariff A-1, there shall be minimum monthly customer charge at the following rates even if no energy is consumed. | ||||||
a) Single Phase Connections: | Rs. 75/- per consumer per month | |||||
b) Three Phase Connections: | Rs. 150 /- per consumer per month | |||||
A-2 GENERAL SUPPLY TARIFF - COMMERCIAL | ||||||
a) | For Sanctioned load upto 5 kW | - | - | 30.25 | ||
b) | For Sanctioned load 5 kW & above | 500 | - | 31.93 | ||
- | Peak | Off-Peak | ||||
c) | Time Of Use | 500 | 33.85 | 27.88 | ||
d) | Electric Vehicle Charging Station | - | 31.93 | |||
Under tariff A-2 (a), there shall be minimum monthly charges at the following rates even if no energy is consumed. | ||||||
a) Single Phase Connections: | Rs. 175/- per consumer per month | |||||
b) Three Phase Connections: | Rs. 350 /- per consumer per month | |||||
Fix Charges shall be billed based on 50% off sactioned load or actual MDI for the Month which ever is higher.In such case there would be no minimum monthly charges even if no energy is consumed. | ||||||
A-3 GENERAL SERVICES | ||||||
a) | General Services | - | - | 29.81 | ||
Under tariff A-3, there shall be minimum monthly charges at the following rates even if no energy is consumed. | ||||||
a) Single Phase Connections: | Rs. 175/- per consumer per month | |||||
b) Three Phase Connections: | Rs. 350 /- per consumer per month | |||||
B1 | Up To 25 kW (at 400/230 Volts) | - | - | 26.83 | ||
B2(a) | Exceeding 25-500 kW (at 400 Volts) | 500 | - | 26.33 | ||
Time Of Use | Peak | Off-Peak | ||||
B1(b) | Upto 25 kW | - | 30.39 | 24.83 | ||
B2(b) | Exceeding 25-500 kW (at 400 Volts) | 500 | 30.33 | 24.62 | ||
B3 | For All Loads up to 5000 kW (at 11,33 kV) | 460 | 30.33 | 24.53 | ||
B4 | For All Loads (at 66,132 kV & above) | 440 | 30.33 | 24.43 | ||
For B1 and B1 (b) consumers there shall be a fixed minimum charge of Rs. 350 per month. | ||||||
Fixed charges shall be build based on 50% of sactioned load or actual MDI for the month which ever is higher.In such case there would be no minimum monthly charges even if no energy is consumed. | ||||||
C - SINGLE-POINT SUPPLY | ||||||
C -1 | For supply at 400/230 Volts | - | - | - | ||
a) | Sanctioned load less than 5 kW | - | - | 30.93 | ||
b) | Sanctioned load above 5 kW & up to 500 kW | 500 | - | 30.43 | ||
C -2(a) | For supply at 11,33 kV up to and including 5000 kW | 460 | - | 30.23 | ||
C -3(a) | For supply at 66 kV & above and sanctioned load above 5000 kW | 440 | - | 30.13 | ||
Time Of Use (Optional) | Peak | Off-Peak | ||||
C -1(c) | For supply at 400/230 Volts above 5 kW & up to 500 kW | 500 | 33.85 | 27.25 | ||
C -2(b) | For supply at 11,33 kV up to and including 5000 kW | 460 | 33.85 | 27.05 | ||
C -3(b) | For supply at 66 kV & above and sanctioned load above 5000 kW | 440 | 33.85 | 26.95 | ||
Fixed charges shall be build based on 50% of sactioned load or actual MDI for the month which ever is higher.In such case there would be no minimum monthly charges even if no energy is consumed. | ||||||
D - AGRICULTURE TARIFF | ||||||
D-1(a) | SCARP less than 5 kW | - | - | 26.93 | ||
D-2(a) | Agricultural Tube Wells | 200.00 | - | 16.60 | ||
- | Peak | Off-Peak | ||||
D-1(b) | SCARP 5 kW & above | 200.00 | 29.88 | 22.60 | ||
D-2(b) | Agricultural 5 kW & above | 200.00 | 16.60 | 16.60 | ||
Under this tariff, there shall be minimum monthly charges of Rs.2000/- per consumer per month, even if no energy is consumed. | ||||||
Note:- The consumers having sanctioned load less than 5 kW can opt for TOU metering. | ||||||
E - TEMPORARY SUPPLY TARIFFS | ||||||
E-1(i) | Residential Supply | - | - | 34.53 | ||
E-1(ii) | Commercial Supply | - | - | 30.64 | ||
E-2 | Industrial Supply | - | - | 27.91 | ||
For the categories of E-1(i&ii) above, the minimum bill of the consumers shall be Rs. 50/- per day subject to a minimum of Rs.500/- for the entire period of supply, even if no energy is consumed. | ||||||
F - SEASONAL INDUSTRIAL SUPPLY TARIFF | ||||||
125% of relevant industrial tariff | ||||||
Note: | Tariff-F consumers will have the option to convert to Regular Tariff and vice versa. This option can be exercised at the time of a new connection or at the beginning of the season. Once exercised , the option remains in force for at least one year. | |||||
G- PUBLIC LIGHTING | ||||||
G | Street Lighting | - | 29.93 | |||
Under Tariff G, there shall be a minimum monthly charge of Rs.500/- per month per KW of lamp capacity installed. | ||||||
H - RESIDENTIAL COLONIES ATTACHED TO INDUSTRIAL PREMISES | ||||||
H | Residential Colonies attached to industrial premises | - | - | 29.93 | ||
I - RAILWAY TRACTION | ||||||
I | Railway Traction | - | - | 29.93 | ||
This Tariff shall remain applicable for the period of 1 year from the date of notification | ||||||
Note : Financing cost surcharges @Rs. 0.43/ KWh would be applicable to all consumers (Except Life Line Consumer of the residential A-1 Category) for electricity sold. | ||||||
K - SPECIAL CONTRACTS | ||||||
1 | Azad Jammu & Kashmir (AJK) | 440 | - | 27.15 | ||
Peak | Off-Peak | |||||
Time Of Use | 440 | 32.85 | 25.95 | |||
2 | Rawat Lab | 29.93 |